Hoistway Blocks
Click images for full view, download full drawings via links below images.
Hoistway Plan
750lb. 36×48
950lb. 36×60
950lb. 40×54
IL-1
Inline openings. Left striking door with the equipment located on the right.
IL-11
Inline openings. Left striking door with the equipment located on the left.
IL-21
Inline openings. Left striking door with the equipment located opposite the opening.
N/A
IR-1
Inline openings. Right striking door with the equipment located on the left.
IR-11
Inline openings. Right striking door with the equipment located on the right.
IR-21
Inline openings. Right striking door with the equipment located opposite the opening.
N/A
RL-1
Front & Rear Openings (walk-through). Front opening strikes to the left / rear opening strikes to the right with the equipment located on the right.
RL-10
Front & Rear Openings (walk-through). Front & rear opening strike to the left with the equipment located on the right.
RL-11
Front & Rear Openings (walk-through). Front opening strikes to the left / rear opening strikes to the right with the equipment located on the left.
RL-12
Front & Rear Openings (walk-through). Front & rear openings strike to the right with the equipment located on the left.
RR-1
Front & Rear Openings (walk-through). Front opening strikes to the right / rear opening strikes to the left with the equipment located on the left.
RR-10
Front & Rear Openings (walk-through). Front & rear openings strike to the left with the equipment located on the left.
RR-11
Front & Rear Openings (walk-through). Front opening strikes to the right / rear opening strikes to the left with the equipment located on the right.
RR-12
Front & Rear Openings (walk-through). Front & rear openings strike to the right / rear opening strikes to the right with the equipment located on the right.
SL-1
Front & Side Openings (90-degree). Front & side openings strike to the left with the equipment located on the right.
N/A
SL-11
Front & Side Openings (90-degree). Front opening strikes to the left / side opening strikes to the right with the equipment located on the right.
N/A
SL-12
Front & Side Openings (90-degree). Front opening strikes to the right / side opening strikes to the left with the equipment located on the right.
N/A
SL-13
Front & Side Openings (90-degree). Front & side openings strike to the right with the equipment located on the right.
N/A
SR-1
Front & Side Openings (90-degree). Front opening strikes to the right / side opening strikes to the right with the equipment located on the left.
N/A
SR-11
Front & Side Openings (90-degree). Front opening strikes to the right / side opening strikes to the left with the equipment located on the left.
N/A
SR-12
Front & Side Openings (90-degree). Front opening strikes to the left / side opening strikes to the right with the equipment located on the left.
N/A
SR-13
Front & Side Openings (90-degree). Front & side openings strike to the left with the equipment located on the left.
N/A
Other Drawings
**Drawings in AutoCAD format are offered as an added convenience to architects, builders and designers. Do not under any circumstances modify the dimensions within these drawings without consulting the factory. These drawings, and the Custom Elevator logo are copyrighted by Custom Elevator Manufacturing Company Incorporated.